PORT OF MANILA
The flow of local products in the market are primarily done through water, air, and land transport-amongst the three, water transport are the most utilized. Considering the archipelagic setting of the country, domestic shipping industry are the most important structural support for the nation’s economy. Shipping industry provides the means for inter-island transport, be that of transporting goods from one port to another, or transporting people to various islands far beyond the reach of air travel. Sea transport are viewed by many ordinary Filipinos as cost efficient as compared to air and land vehicles.
Port of Manila facilitates the flow of people and products in between the center of industries in the country, and various strategic ports in the southern region thru its modern port facilities. Finish product made by various manufacturing companies in the National Capital Region, and imported products coming from different parts of the world comes and goes here everyday-with projected annual container traffic of about three million TEU’s. Moreover, sea-going public uses the port’s newest passenger terminal facility to get to their destination in the province south from here. Port of Manila also served as major entry for people, and Agri-marine products coming from Visayas and Mindanao region.
PORT OF ENTRY: Manila North Harbor
Manila North Harbor by the way belong to the Port of Manila, the country’s link to major cities of the world, and the junction of domestic and international trade. Metro Manila’s domestic shipping is centered entirely in North Harbor facilities, located in the shores of Tondo- northeast of the Manila International Container Port along the eastern part of Manila bay. Entrance to Manila Bay on the other hand is between the south approach of El Fraile/ Corregidor Island, and the north approach of Caballo Island. These sea-channel approach is about two miles (3.2 km) towards the north, and six and a half miles (10.5 km) wide on the south side. Its Geographical coordinates consist of the ff:
22° 17′ 46″ North, and 114° 11′ 25″ East
North Harbor-being smaller than that of the South Harbor in terms of annual cargo/container traffic, has a total quay length of around 52 hundred meters, and a total of 41 berths along its various Piers, and Slips. These Port connects every major, and minor ports/wharves located in Luzon, Visayas, and Mindanao region. Accessible via the Radial road (R-10) from Navotas City, and Roxas Boulevard via Delpan (Roxas) Bridge.
Manila North Harbor’s facilities are created with the sole purpose of serving the growing domestic passenger, and cargo shipping activities within the country. It form part of Manila Port’s backbone, which includes Manila South Harbor, Manila International Container Terminal , Harbor Centre Port Terminal, and the Port facilities located along the banks of Pasig River extending to Jones bridge in Binondo Manila.
The Operation and Administration of the Manila North Harbor were transferred to the Philippine Ports Authority from the Bureau of Customs on December 23, 1975 by virtue of Presidential Decree No. 857, signed by then former President Ferdinand Marcos.
Vitas Port in Tondo on the other hand, were declared part of the North Harbor Custom Zone by virtue of Executive Order nos.297 dated March 4, 1971.
On November 26, 1981 the whole of Vitas area bounded by Pier 18 in the north, Radial road 10 in the east, the Marine Slipway area in the south, and Vitas rock bulkhead in the west have been transferred and placed under the administration of the Philippine Ports Authority by virtue of Executive Order nos. 749, also signed by President Marcos.
PORT HISTORY
Construction of North Harbor begins in 1937, and during this time all domestic inter-island ships/boats of small tonnage anchors along the Pasig river banks. In 1941 Piers 2, 4, 6, and 8 have been all completed thereby shipping activities gradually shifted in the North Harbor. Before the outbreak of hostilities in World War II, Manila Port’s North Harbor has the following port improvements namely;
Pier 2, 4, 6, and 8, both of which had 80.43 meters wide x 220.25 meters long pier platform.
To render the docks safe for ships while at berth or during anchorage, a 1300 meters long x 3 meters wide North Harbor breakwater have been constructed, and a 179.71 meters wide dock or slipway in between these piers.
On the other hand, the completion of three other piers namely Piers 10, 12, and 14 were interrupted by the war.
WORLD WAR II
During the escalation of war, these harbor installation were subjected to extensive bombings, and air-raids by Japanese Invasion Forces and later by US Liberation Forces. Although compared to the nearby South Harbor, the piers along North Harbor suffered less damages due to perhaps less penetration or concentration of bombs and other explosive ordinance directed to this area. North Harbor and the rest of Manila Port were not usable for shipping until April 1945, due to harbor obstructions and port facility damages.
Immediately after the liberation of Manila, US Corps of Engineers known as “MANED” under the consultation with the Philippine Port Commission undertook repairs to the existing piers. Damaged portions of the piers were replaced with timber deck on timber piles, some piers were lengthened by providing additional berthing spaces at both end. Obstruction to navigation along the channel leading to this piers where removed while dredging of the channels are conducted by the elements of US Army, and the Navy.
On September of 1947, US Army then turned over the North Harbor facilities to the Philippine Government. The Division of Ports and Harbors of the Bureau of Public Works took charge of the construction, repair, and maintenance of this pier.
PMO NORTH HARBOR
The Port Management Office-North Harbor (PMO – NH) were created on July 1988, as one of the port management offices under the administrative and operational jurisdiction of the Port District Office of Manila. PDO Manila as it was known, on the other hand, is one of the five (5) major port district offices under the Philippine Ports Authority, a government–owned corporation created under Presidential Decree No. 505 dated 11th of July 1974, as amended by Presidential Decree No. 857 and further amended by Executive Order Nos. 513, 546 and 159.
PMO-North Harbor is headed by a Port Manager and has full jurisdiction over the following:
Piers 2 (Negros Navigation) and Isla Puting Bato.
Pier 4 (Gothong Southern, and North Harbor Tugs Corp.).
Pier 6 (MORETA Shipping Lines, Romblon Shipping Lines).
Pier 8 (Solid Shipping Lines).
Pier 10 (Lorenzo Shipping Lines and Gothong Lines).
Pier 12 PSACC (former Sulpicio Lines).
Pier 14 (Oceanic Lines, Loadstar Shipping Lines).
Pier 16 (Escano Shipping Lines).
Marine Slip Way (MSW).
The Harbour Centre Port Terminal (HCPTI) on the other hand, is a private commercial port located North of Pier 18 in Vitas Tondo, several meters from the former dumpsite of the metro known and identified as Smokey mountain (dumpsite of the Metro in the 80’s and 90’s). HCPTI has a spacious 79 hectares facilities that complements the government owned ports particularly North and South Harbor. The Harbour Centre Port facilities handles cold/ hot rolled coils, wire rod coils, H-beams, Steel pipes and billets, grains and non-grains, rice, fertilizers, and raw sugar shipped from foreign or domestic sources. Its Geographical coordinates consist of the following:
14°37’55″N 120°57’1″E.
PPA Board Resolution Nos. 1976 issued on November 13, 2003 allows Harbour Port (formerly R-II Builders, Inc.) to operate only as foreign non-containerized cargoes, and non-containerized vessels. In addition to that, it also granted to operate as a commercial private port and accommodate all types of domestic vessels and cargoes. Prior to the entry of Harbour Centre Port Terminal in 1996, PPA were the only operator of the Ports of Manila.
Meanwhile, there are two significant events brought about major changes in the operations of PMO-North Harbor. First on June 19, 2000, jurisdiction over the Terminal Ports of Lamao and Mariveles in the Province of Bataan were transferred from PMO North Harbor to PMO – Bataan. Second major changes was on the 16th of April 2000, wherein Port Authority- precipitated by a threat of strike, issued PPA Memorandum Order No. 07-2000 creating the North Harbor Port Services (NHPS) that took over the operations of four private cargo handling operators, namely:
- United Dockhandlers, Inc. formerly servicing Piers 6, 12, 14 and 16;
- Pier 8 Arrastre and Stevedoring formerly servicing Pier 8;
- Veterans Shipyard Corporation, formerly servicing Marine Slipway (MSW);
- Interport Stevedoring and Arrastre Services, formerly servicing Isla Puting Bato (IPB).
The government’s National Port Plan were conceptualized during early years of North Harbor’s existence were it said it will developed its capability to handle large domestic vessels, construction of sufficient back-up/storage facilities to accomodate large volume of container vans, and other cargoes. Passenger terminals and container facilities along Pier 2 (Negros Navigation), Pier 4 (Aboitiz), Pier 6 and 8 (Gothong, Sweet Lines, and Moreta Shipping Lines), Pier 12 (Sulpicio Lines), and Pier 14 (William Lines) were then constructed and/or improved to meet the needs of port users and sea-going customers.
In 1999, as a result of the increased cargo and vessel traffic, PMO North Harbor generated gross revenues of P468.3 million or P20 million more than the 1998 revenues.
NORTH HARBOR STATISTICS
2009 |
2010 |
2011 |
2012 |
|
SHIPCALLS |
7,650 |
4,967 |
5,284 |
5,329 |
PASSENGER TRAFFIC |
1,116,662 |
821,983 |
728,662 |
766,942 |
CARGO THROUGHPUT in m.t (Domestic & Foreign) |
17,406,085 |
16,146,329 |
18,442,473 |
19,174,424 |
CONTAINERS (teu) |
638,263 |
553,548 |
771,603 |
865,726 |
Source: PPA /Port Statistics
VESSEL TRAFFIC MANAGEMENT
On June of 2006 marks the completion and official turn-over to Port District Office- Manila, of the Vessel Traffic Management System (VTMS). The said project aims to establish a system of identifying, tracking, monitoring of all marine vessel activities, and to promote safer, more efficient navigation. The VTMS Project began in May of 2004 immediately with the award of the contract to F.F. Cruz/Japan Radio Co. The completed facilities in three locations- the MICT, Manila North Harbor, and Corregidor Island. It consist of a six-story building with 42 meters structural steel tower, 18-meter cylindrical concrete structure with electronic and generator room, and a 35-meter cylindrical concrete structure with three-story building at the highest.
PRIVATIZATION PROJECT
Philippine Ports Authority awarded the P14.5-billion, 25-years modernization project (renewable for another 25 years) to the sole bidder Manila North Harbour Port, Inc. (MNHPI)- a joint venture between Harbour Centre Port Holdings Inc. (HCPHI) and a diversified conglomerate of San Miguel Corporation, on the 19th of November 2009. Took over commenced on the 12th of April 2010, or five months after the contract were signed between the parties involved.
The said project will modernize the Manila North Harbor through the operation and management of its various facilities serviced by MNHPI as port operator, in a build-operate-transfer (BOT) term arrangement with the Philippine Ports Authority (PPA). The project aims include among others:
-
The development (Construction) of world class terminal facilities, including the provision of the state-of-the-art equipment, and guarantee the repair and maintenance of the said equipment and facilities without any cost to the government.
-
To achieve the maximum level of port efficiency at the most reasonable and competitive price in the provision of port services to the port users and the general public.
-
To allocate funds for the amortization of existing loans for North Harbor and attain/sustain reasonable return on the PPA investment in all facilities.
On June of 2012, a groundbreaking ceremony were held for the construction of the new Passenger Terminal Building (PTB)- it aimed to consolidate passenger operations within the confines of Pier 2 and 4. The said project would also replaced the old passenger terminal building found in Pier 4, which used to be the based of operation of former shipping giant the William Gothong, and Aboitiz Inc. (W G & A) during their merger in 1995.
Upon completion, the sprawling North Port Passenger Terminal Complex is considered the country’s most modern facility of its kind, built solely by Manila North Harbour Port Inc. (MNHPI); it aimed to promote safety and security, convenience and efficiency, and most especially comforts for its passengers and other port users. Designed to conform International Standards, the said terminal complex (cost around P200 million to build) is located in a 12,000-square meters complex were a two-story fully air-conditioned main building that houses a 1,900 seating capacity expandable to 3,800 seating capacity.
Passenger amenities also includes a prayer room; a play room; nursing and diaper-change rooms; a clinic, and food kiosk while awaiting for boarding calls. Security equipment in the form of x-ray baggage scanners matching the norms in the airline sector are among other features. Outside the building are ticketing area/concessions, spacious drop-offs, and parking area for motor vehicles.
After a year of construction, it held an initial soft opening on May of 2013. Six months after, on November of the same year the said passenger terminal was inaugurated by officers of MNHPI, and government officials led by Department of Transportation Secretary Emilio Abaya.
On related upgrading of the North Harbor facilities, MNHPI’s P7.8-billion investments on port infrastructure, equipment and information technology is ongoing. A 480 million pesos worth of cargo handling equipment have been recently delivered at the port- this were two units of container cranes to complement the port’s existing two units, whereas the 12 rubber-tired gantry cranes are set to arrive early next year.
North Harbor’s 53-hectare facility can accommodate over 300 vessels a month or almost 4000 ships yearly, with zero queuing time as it offers a total of 46 berths and 660 meters of which is a continuous quay lane, served by container cranes with state of the art computerized operations including the latest Navis SPARCS-N4 or Synchronous Planning and Real Time Control System, a globally recognized terminal operating system developed by Navis Corporation of Oakland, California.
Refferrences:
- MANILA NORTH HARBOUR PORT, INC.
- http://www.ip3.org/pub/publication014.htm
- Competition Policy and Regulation in Ports and Shipping by Gilberto M. Llanto, Enrico L. Basilio and Leilanie Basilio
- http://siteresources.worldbank.org/INTPHILIPPINES/Resources/Basilio.pdf
- Philippine Ports Authority/Port Statistics
- http://www.manilastandardtoday.com/insideNews.htm?f=//2009/november/20/news7.isx&d=/2009/november/20
- http://www.coa.gov.ph/2000_AAR/GOCCs/PPA/PPA-PMO-NH_es00.htm
- http://reklamo.ph/ppa/
- Port of Manila and other Philippine Ports, Yearbook 1949.
- Philippine Ports Authority
Further reading:
hi! ask ko lang po, meron po bang mabibilhan ng scrap steel jan sa manila north harbour pier? thanks
LikeLike
Hey verʏ іnteresting blog!
LikeLiked by 1 person
Thank you.
LikeLike
U produced several superb points in your post, “Featured Port: The Manila North
Harbor Philippine Ship Spotters Society”.
I am going to end up coming back to your site in the near future.
Thank you ,Mason
LikeLike
Dear Mason,
Thank you for visiting Pinoy Shipspotters Blog (No longer Philippine Ship Spotters Society). Should you have any question to ask, feel free to leave a message here I will be glad to answer a soon as I read it.
Best Regards,
Migu
LikeLike
hi ask po if dito din po kona cargo ang boxes papunta sa mga destination nila ?
LikeLike
Ano daw? Pwede paki ayos ng konti ang question di ko maintindihan eh.
LikeLike
Pingback: transport | truck | cargo
cno poh pede tumulong skin para mka pag work ako sa costume pangarap ko poh kc mkapag work jan khit anung work poh jgarandia11@yahoo.com kng cno man poh mkakabasa nito mraming slamat poh
LikeLike
Sir,mcgutib how can i contact you ? business proposal this is louchie my email ad is louchielouttieirma@yahoo.com.ph
LikeLike
hi….
i want to know if we can have prenup at north harbor pier?what are the requirements required?
LikeLike
I’m sorry but I really have no idea.
LikeLike
hi do you know where Port Coquitlam Development Corporation North Harbor Road, Philippines is?
thnx!!! 🙂
LikeLike
hi…. do you know where the Port Coquitlam Development Corporation North Harbor Road is?
thx!!:)
LikeLike
What pier will i ride going to Caticlan, Kalibo or Dumaguit because I am planning to go to Boracay on April 29(Friday) or 30(Saturday)?
Kindly e-mail me at “sam_d_ham@yahoo.com”
Thanks! And I am hoping for you immediate reply.
LikeLike
hi, we have a project about port (this is a new one, i think) and we need some information about the port traffic in manila, cargoes, companies, etc.. do you know who to contact about it? is it searchable on the internet? thank you very much. we badly need people’s help for this 😦 thank you!
LikeLike
Hello,
Yes I think I can find some of this info’s. E-mail me at mcgutib@yahoo.com
LikeLike